中文
English

To do BCI certification for a embossing factory, first do these two things correctly

2026-11-27

In the cotton supply chain, the cotton gin is the first gateway for seed cotton to become lint, and it is also the most easily underestimated link in the BCI traceability system. In the 2024/25 season, approximately 23.87% of global cotton production is BCI cotton, and over 4300 supply chain locations have obtained physical BCI cotton procurement certification. Behind the data is an increasingly stringent requirement: every link in the chain must be able to prove where the cotton in hand comes from.

BCI's "Registration and Entry of Rolling Mills - Certification Body Guidelines" released in October 2025 breaks down the entire process into several clear actions. Two of the most easily exposed issues at the audit site are the use of AAV (Annual Authorization Volume) code and the standardization of subcontracting contracts.

1、 Why do we need to take action now

First, clarify the timeline.

Starting from the 2025/26 season, the embossing plant will be certified according to the "Chain of Custody Standard" v1.0; Starting from the 2026/27 season, v1.1 will be applicable.

The certification is valid for three years, and the factory can apply for it in any of the three quarters of 2025/26, 2026/27, and 2027/28.

From the 2027/28 season onwards, if you still want to process and sell BCI cotton, you must hold a certificate.

Registration usually starts 2 to 5 months before cotton harvest, and for domestic factories, this window is right in front of them.

In other words, registration is a prerequisite for authentication. I haven't completed the registration process, so I don't even have the qualifications to queue for review.

2、 Five thresholds, six step process

Qualification verification is the first sieve and also the most easily underestimated step. There are five conditions listed in the guide:

1. Registered in accordance with the law and holding a valid factory license.

2 is not on any internationally recognized default list, nor is it associated with any listed companies, including the ICA non performance award list, GOTS certification ban list, and Textile Exchange ban list.

All non conformities from the previous audit have been closed.

If subcontracting is involved, corresponding contractual arrangements, such as lease agreements, must be in place.

5. Designate a primary contact person responsible for ensuring compliance with the Chain of Custody Standards and completing online or offline training organized by BCI.

After verification, the process proceeds in six steps:

① Intention to proactively contact BCI at the embossing factory

② Qualification verification

③ Fill out the online registration form for the embossing factory

④ Participate in the Rolling Mill Training Program (GTP)

⑤ Sign the agreement and submit supporting documents

⑥ Open BCP (Good Cotton Platform) access permission

001.png

The sequence of the middle steps may be adjusted according to regional requirements, but the first and last two steps remain the same: active contact and access to the platform. Supporting documents include factory license, tax payment certificate, and contract agreements related to leasing, contract processing, or subcontracting.

⚠️  Details that are easily overlooked: opening a new account for a new factory; Deactivate or reactivate old factories after updating address, contact person, and other information; If a company leases or subcontracts a new factory, even if the management team remains unchanged, a separate BCP account must be opened for the site.

3、 BCP account: clothing delivery rate and end of season reset

Getting the account is just the beginning, what really determines the success or failure of the audit is whether the accounts match.

Gin Outturn (GOT) refers to the percentage of lint that can be produced from 100 kilograms of seed cotton.

Three disciplines:

The interval is usually between 30% and 45%, and the system only accepts integers.

If the actual garment production rate is significantly higher than the set value during the season, BCI can be contacted for revision, but repeated modifications are not allowed within a season, and adjustments should only be made at the beginning of the season.

The input quantity of the three links of procurement, production, and sales should match the actual net weight record, and the quantity verification should be carried out in accordance with Section 5 of the "Chain of Custody Standards".

There is also a hard time point for clearing at the end of the season. BCI notifies the zero tolerance date by email one month in advance each year, and the factory must enter all BCI cotton sales for the current season into BCP before this date.

4、 Key point one: AAV code, 9-digit key

AAV (Annual Authorized Volume) is an estimated production output of a Producer Unit (PU), which is a 9-digit code generated based on the expected output in BCI's internal database during farm licensing or certification, and added to BCP.

The function is very specific: the cotton gin must use this code to enter seed cotton purchase records in BCP. Without code, seed cotton cannot be credited to the account, and the subsequent production, sales, and traceability of cotton skins are all disconnected.

Several practical points:

Farmers within the same PU share one AAV code; The code for different PUs is different and cannot be mixed.

The code was approved by the BCI China team compliance@bettercotton.org send out; In countries where BCI projects are directly implemented, PU representatives can also collect and transfer them.

The factory should keep an email record of receiving AAV codes, which the auditor will verify.

The auditor verifies the traceability of procurement through document verification and personnel interviews, including employees who actually handle procurement.

AAV is allocated according to production units, which are composed of similar farms. The area definition and production unit scale of farm types are shown in the table below.

Table 1 Farm Types and Production Unit Sizes

Farm type

Definition of Area

特Characteristics and Production Unit Scale

Small Farmers (SH)

Not exceeding 20 hectares

Unstructured dependence on long-term employees; PU scale is approximately 3500 to 4000 households

Medium sized Farm (MF)

20 to 200 hectares

Usually structurally dependent on long-term employees; PU scale of about 100 households

Large scale Farm (LF)

Over 200 hectares

Mechanized production or reliance on long-term employees; Participate in individual or large-scale farm group guarantee mode


Another confusing point is that seed cotton inventory is generated when the factory records the purchase of seed cotton from certified or licensed producers, while lint cotton inventory is generated by recording lint cotton production. Two types of inventory are managed separately and must be reset to zero at the end of the season.

5、 Key point two: Subcontracting contracts must be named by name

Subcontracting is very common in the embossing process, and BCI does not prohibit it, but requires that the relationship be clearly stated. The relevant parties need to sign a contract agreement and highlight the specific requirements for subcontracting in Section 2.7 of the Chainof Custody Standards.

In terms of term, in most cases, the contract covers at least one cotton planting season, and the agreement can also be extended to multiple years or seasons.

The two common situations listed in the guide are:

Scenario 1: Company A does not have its own embossing plant and rents a factory from Company B for production. Both parties shall sign a contract with a clear term, covering the legal and physical possession of BCI cotton, record and site access rights, service content, paymentterms, as well as access rights required for review and evaluation.

Scenario 2: Company A already has its own factory, and in order to supplement production capacity, it rents other factories. The terms of the contract are consistent with the situation.

Four areas that are prone to problems:

① The subcontracted site shall not carry out any activities for itself, and can only act on behalf of the subcontractor, unless otherwise specified in the contract.

② The subcontractor is the certificate holder, but the address stated on the certificate must include the name and address of the subcontracted site.

③ The subcontracted site must undergo on-site inspection, and all personnel involved in BCI cotton processing or BCP operations must be interviewed.

④ When changing the subcontracted site, the certification body must be notified: the original scope certificate is revoked or cancelled, the new site is re audited and a new certificate is issued, and a new BCP account is opened. This one is most likely to be missed when changing factories without changing personnel.

Before conducting subcontracting activities for the first time, enterprises should also notify BCI and explain the main activities of subcontracting.

6、 Three suggestions for the factory

Suggestion 1: Reverse the schedule

Start registration 2 to 5 months before harvesting, don't wait for the scale to open. Rolling is a highly seasonal industry with high personnel turnover. Training for management, BCP operations, and key control point positions should be scheduled in advance.

Suggestion 2: Align the three accounts

Any ambiguity in terms of garment delivery rate, AAV code, and inventory will result in non-compliance upon arrival at the site. It is recommended to designate a dedicated person to maintain BCP and keep complete physical records of procurement, production, and sales.

Suggestion 3: Subcontracting should be signed first before discussing certification

The contract terms, venue address, and BCP account must be consistent. BCI does not publicly disclose the list of embossing plants. When verifying the registration status, certification bodies usually require a screenshot of the BCP "Company details" page or send an email to compliance@bettercotton.org Inquiry, usually replied within 2 working days.

Registration is not a procedural procedure, but an interface that connects the factory to the BCI traceability system.

The AAV code determines whether the seed cotton can be credited, while the subcontract determines which site the certificate covers. If these two things are done correctly, the subsequent review will proceed smoothly.

As a BCI approved certification body, ASCP will provide customers with efficient and compliant certification support. If you have any questions, please contact the ASCP team.

Source material

BCI《Ginner Onboarding and Registration – A guidance for Certification Bodies》(2025 October of the year); The background data and certification schedule refer to the publicly available information on the BCI official website (better cotton. org, accessed in November 2026).

Contact information

Mobile phone: 18562812666

Phone: 0532-66982347

Email: info@ascpservices.com

Long press the QR code below to directly add customer service WeChat.

wade二维码.jpg

share